The Craven Law
Library (Fremantle) re-opened on Tuesday 11th March after a series of renovations and improvements.
The air-conditioning system has been replaced and the lower level lighting re-engineered. We have also taken the opportunity to re-configure the floorplan to make the Library easier to use and more spacious. The key floorplan change is the relocation of primary legal materials to the top level of the Library and the relocation of the secondary legal materials to the ground level.
No comments:
Post a Comment